Pillarer heises opp på en lekter i skjermet sjø ved land. Pillarene skal brukes til installasjon av understellet til den nye prosess- og boligplattformen på Valhallfeltet.
Pile Transfers fm V5 transport barge to S7000 deck complete. This is done inshore in a 'sheltered' location to avoid delays offshore.
There are 12 piles (4 levelling piles at 68.4m ...
Pile Transfers fm V5 transport barge to S7000 deck complete. This is done inshore in a 'sheltered' location to avoid delays offshore.
There are 12 piles (4 levelling piles at 68.4m & 357te each and 8 other piles at 66.9m & 349 te each) total weight of piling is 4,220 te. Diameter is 2590mm (102"). Wall thickness is a constant 80mm and you will note they are square ended. The painted end is the upper end which will stick above the top of the pile sleeve - this is required to locate the pile hammer on and is painted to avoid future drain on the jacket corrosion protection system. Markings are there to observe (with ROV's) the penetration during piling.
Subject
Pillarer heises opp på en lekter i skjermet sjø ved land. Pillarene skal brukes til installasjon av understellet til den nye prosess- og boligplattformen på Valhallfeltet.
Add a comment or suggest edits
To publish a public comment on the object, select «Leave a comment». To send an inquiry directly to the museum, select «Send an inquiry».